Office Move Checklist: How to Plan & Move Your Furniture

Oct 15, 2026

- Forrest Wells

Office move checklist Chico

Plan your office furniture as soon as you sign the lease for your new Chico space. Most businesses wait until the move is a few weeks away, and that’s too late.

New desks and chairs can take several weeks to arrive after you order them. You also need time to check your layout against the actual room. A plan that looks fine on paper can block a doorway or cover an outlet once the furniture is in place.

Here’s the checklist our team at Esplanade Office uses to help businesses in Chico and the North State move or expand.

1. Measure and Document the New Space

Start with the floor plan from your landlord or broker. Then walk the space with a tape measure and check it. Floor plans often skip columns, wall jogs, and built-ins that change where furniture can go.

Record these details before you pick a single piece:

  • Room sizes and ceiling heights

  • Door widths, which way each door swings, and hallway widths

  • Stair, elevator, and loading dock sizes

  • Every outlet, data jack, and floor box

  • Windows, plus which ones get strong afternoon sun

  • Vents, thermostats, and anything mounted on the walls

Take photos of every wall from the doorway. Your planner will use them more than you'd guess.

Pay close attention to walkways. The 2010 ADA Standards set a 36-inch minimum clear width for accessible walking routes (U.S. Access Board, Section 403.5.1). California goes further. The California Building Code calls for 44 inches in corridors that serve 10 or more people (CBC 11B-403.5.1). Desks and file cabinets eat into those paths fast.

Delivery access matters too. A one-piece, 12-foot conference table will struggle to make the turn up a narrow stairwell in an older downtown building. Your planner needs that detail before the order goes in, so the table can ship in sections.

2. Decide What to Keep, Replace, or Reconfigure

Walk your current office with three colors of painter's tape. Green means keep. Yellow means reconfigure. Red means replace.

Keep

Keep pieces that are sturdy, fit the new plan, and match the look you want. Steel filing cabinets and well-built desks often survive two or three moves.

Reconfigure

Modular workstations, panels, and storage can change shape to fit a new floor plan. Unsure which type you own? Our guide to modular vs. traditional office furniture breaks down the differences.

Replace

Replace chairs with failing height levers, desks that wobble, and anything with peeling laminate or broken drawers. Moving a broken chair costs the same as moving a good one. Leave it behind.

Plan for the red-tape pieces early. The EPA reports that 80.1 percent of furniture and furnishings went to landfills in 2018 (EPA). Ask about donation, resale, or recycling before move week. Removal fees surprise a lot of buyers, so read our breakdown of the hidden costs of office furniture before you set a budget.

3. Plan Workstations, Meeting Rooms, Storage, and Reception Together

Every zone in your office competes for the same square feet. Plan them one at a time and the last zone always loses. Usually, that's storage or the reception area.

Lock in your workstation count first. Count the people you have today and the hires you expect over the next two to three years. Then let the other zones flex around that number.

  • Workstations: Match the desk to the work. People who juggle two monitors and paperwork often do better with a corner setup. Our comparison of L-shaped desks vs. traditional desks can help you choose.

  • Meeting rooms: Leave at least 36 inches behind each chair so people can sit down and still walk behind someone who's seated. Check how often each room gets booked before you size the table.

  • Storage: Put shared storage near the people who use it. Desks with built-in storage cut down on extra cabinets in tight rooms.

  • Reception: Clients form their first opinion here. Give it real square footage, a desk that fits your check-in process, and enough seats for your busiest hour.

4. Time Delivery and Installation Around Move-In Day

Furniture installers, IT, movers, and your electrician all want the same few days. Set the order early so nobody waits on anyone else.

Here's a sample timeline for a mid-size office move. Your dates will shift with manufacturer lead times and building rules.

When

What to do

10 to 12 weeks out

Schedule a space-planning consultation and gather measurements

8 weeks out

Approve the layout and place the furniture order

4 weeks out

Reserve the elevator and loading dock, and send any insurance certificates your landlord requires

2 weeks out

Confirm delivery dates and finish electrical and data work

Install days

Furniture goes in first, then IT sets up computers and phones

Move-in day

Your team unpacks into a finished office

Get furniture installed before your IT crew arrives. Techs need the desks in place to mount monitors and route cables.

Lead times vary by manufacturer and by where the furniture is made. Our article on Made in USA office furniture compares lead times for domestic and imported pieces.

Can't close the office for a day? Ask about after-hours or weekend installs. Our installers deliver, assemble, and clean up, and we sort and recycle all the packaging.

5. What to Bring to Your Space-Planning Consultation

A good consultation turns your notes into a floor plan. The more you bring, the faster you get a plan you can approve.

  • The floor plan, as a PDF or CAD file if you have one

  • Your wall photos and measurements

  • Headcount today and expected headcount in two to three years

  • Photos and sizes of the pieces you plan to keep

  • Your move-in date and any building rules from the landlord

  • A budget range

  • Brand colors or finish samples

  • A short wish list from each team

At Esplanade Office, our design team comes to your space, evaluates it, and builds a plan with 3D renderings. You get the plan and a quote free of charge. For a wider look at choosing pieces, see our office furniture buying guide.

Ready to Plan Your Chico Office Move?

Moving or expanding your office? Schedule a complimentary space-planning consultation before you order furniture. Let's talk about your new space, or call us at 530.891.4221.

Frequently Asked Questions

How far ahead should I plan furniture for an office move?

Start 10 to 12 weeks before move-in. That window gives you time to measure, approve a layout, and cover manufacturer lead times. Larger offices and custom pieces may need more time.

Can I reuse my old furniture in the new office?

Yes, and you often should. Sturdy desks, steel storage, and modular workstations can move with you or get reconfigured. A space planner can show you where each piece fits before moving day.

Do I need an ADA-compliant office layout?

Businesses open to the public must follow the ADA, and California adds its own accessibility rules in Chapter 11B of the building code. Keep walkways clear and confirm details with your architect or the City of Chico building division.

Does Esplanade Office charge for space planning?

No. Our design team visits your office, evaluates the space, and gives you plans and a quote free of charge.